Service area and pool permits by town

Who issues pool permits in Scottsdale, Paradise Valley, Fountain Hills, Cave Creek, Carefree, and unincorporated Maricopa County, and what each asks for.

Saguaro cacti and palo verde below a granite boulder hill in the McDowell Sonoran Preserve
McDowell Sonoran Preserve near the Brown's Ranch Trailhead, Scottsdale. Photo: Citizen 4474 / Flickr.

One mailing address, several permit offices

This site covers Scottsdale, Paradise Valley, Fountain Hills, Cave Creek, Carefree, and the north Scottsdale communities between them: DC Ranch, Troon North, Grayhawk, McDowell Mountain Ranch, Pinnacle Peak, Desert Mountain, and Old Town.

The permit office depends on the parcel, not the mailing address or the community name. Confirm the jurisdiction with the permit office before plans are drawn, because setbacks, barrier details, and submittal checklists differ from one office to the next.

City of Scottsdale

Covers DC Ranch, Troon North, Grayhawk, McDowell Mountain Ranch, Old Town, and the other communities listed above whenever the parcel is inside city limits.

  • Code: the 2021 International Swimming Pool and Spa Code with city amendments, in Chapter 31, Article XIII of the city code.
  • Setback: 2 ft from the property line as the standard, unless an easement affects the lot. Equipment sits at least 10 ft from any opening to a neighbor's living space.
  • Barrier first: the city won't approve the pool plan until it approves the fence or wall plan.
  • Environmentally Sensitive Lands: the ESL overlay covers 134 square miles of desert and mountain land north and east of the CAP canal. It requires part of each lot to stay as natural area open space (NAOS). The share depends on landform and slope. On flat ground (0–2% slope) it is 20% in the Lower Desert, 25% in the Upper Desert, and 50% on Hillside land.

The new pool page walks through the city's site plan checklist.

Town of Paradise Valley

Paradise Valley runs its own permit process. Pool and spa permits go through the Building Department, and floodplain and grading permits through the Engineering Department. The town says "all permit applications must be submitted electronically," through its online Citizen Portal.

The town's pool permit application asks for:

  • the contractor's ROC license number and Arizona sales tax ID
  • whether the parcel is hillside-designated
  • two plan sets showing setbacks, public utility easements, washes, drainageways, drainage easements, and utility lines
  • pool dimensions and decorative features
  • engineering calculations and plans stamped for the current year

The form includes a dust control plan for disturbed areas up to 4,356 sq ft. On hillside-designated property, the Hillside Building Committee reviews the project and often requires a staging plan, financial assurance, and staked limits of disturbance.

Town of Fountain Hills

Fountain Hills adopted the 2024 International Swimming Pool and Spa Code through Ordinance 25-06, effective September 1, 2025. The town's amendments:

  • require a barrier at least 60 in. above grade on the side away from the pool
  • limit gaps between vertical members to 1-3/4 in. where horizontal members sit less than 54 in. apart
  • delete Section 303.1.3, the energy-code requirement for a vapor-retardant cover on heated outdoor pools

Town of Cave Creek

Cave Creek's pool, spa, and barrier permit packet (revised January 19, 2023) lists the 2021 International Building and Residential Codes and the 2020 National Electrical Code. It doesn't list a pool and spa code. Key points from the packet:

  • No grading, grubbing, stockpiling, or site preparation before the building permit issues.
  • The town verifies the contractor's ROC number and classification and requires a Cave Creek business license.
  • Two site plans and two sets of plans, with the full barrier shown even if the barrier gets its own permit.
  • A building fee of $500 with pool standards on file, or $600 without (2023 packet).
  • HOA approval "is not a Town requirement," so owners contact the HOA on their own.

The town's barrier rules require a barrier at least 60 in. high, with no opening that passes a 4 in. sphere, kept at least 20 in. from the water's edge. Pedestrian gates must self-close and self-latch.

Town of Carefree

Carefree's residential pool plan review checklist (revised January 5, 2022) asks for:

  • a site plan showing the pool, equipment, and barrier
  • a grading and drainage plan of the pool area, stamped by a civil engineer
  • a barrier permit applied for before the pool permit is approved
  • equipment screened by a solid wall and gate
  • engineering for negative-edge pools
  • a separate permit for gas lines
  • an HOA letter of approval

No pool, spa, or equipment may sit in a building setback. Where the barrier encroaches into a setback, it can be no taller than 5 ft, measured outside.

Unincorporated Maricopa County

On county land, the Planning and Development Department reviews private residential pools. The county's separate Swimming Pool Program covers public and semi-public pools only. Requirements for a private pool there:

  • no pool in the required front yard
  • at least 3 ft from all property lines
  • a barrier top at least 60 in. above finished grade, latches at 54 in. or higher, and gates that self-close, self-latch, and open away from the pool
  • the barrier permit issued before the barrier goes up, the pool is plastered, or it is filled

Dust rules everywhere

Maricopa County Air Quality's Rule 310 applies across all of these jurisdictions. No one may start a dust-generating operation that disturbs 0.10 acre (4,356 sq ft) or more without a dust control permit. The rule makes the owner, developer, and general contractor responsible.

HOAs and design review

Many master-planned communities in north Scottsdale have design review, and the CC&Rs say what needs approval. DC Ranch says "any major landscape change would require approval and should be submitted through the modification process." Arizona law, A.R.S. §33-1817(B), says an association's approval of plans "shall not unreasonably be withheld."

Get written HOA approval before the permit submittal. In Carefree the town requires it. Elsewhere, getting it first helps avoid an HOA dispute after construction starts.

To send a request, use the request form. It goes to an independent local pool contractor.

Ready to talk with a pool contractor?

Describe the lot and what you have in mind. The request goes to an independent local pool contractor, who may contact you to discuss it.